Our Projects

Overview

Next time you enjoy the football or any other sporting event at Domain Stadium appreciate the fact that the stadium is operating at an optimum efficiency thanks to power factor correction (PFC) equipment supplied and validated by Auto Control Systems.

Auto Controls utilised state-of-the-art logging equipment to determine the exact existing power factor and harmonic distortion levels at the stadium prior to supplying the two new PFC units.

ACS then validated that the units were doing their job and the stadium is now operating at its maximum efficiency saving the owners thousands of dollars per year on their electricity bills.

 

Technology Used

  • Power Factor Correction
  • Harmonic Analysis
  • Electrical Engineering

 

If you have a similar project or would like to discuss your unique automation requirements with Auto Control Systems, please call (08) 9258 4555 or alternatively fill in the form below.

Auto Control Systems is dedicated to providing clients with innovative automation solutions customised to suit your specific application

Latest News
21
Jun
Hazardous Areas Worksite Regulations In Australia: Do You Comply?

Hazardous areas worksites that contain electrical equipment are required by law to comply with all corresponding Australian standards and regulations. If you don’t comply to these standards, not only do you risk the lives of your employees, but your organisation may not be covered by your current insurance. There are hundreds of standards and certifications […]

07
Jun
Tips To Make Your Workplace Safer

Efficiently running a company in terms of profit margins is very important. However, ensuring you don’t risk the safety of your employees on your site is not just as essential, but a real responsibility. The adherence to safety guidelines and requirements is crucial to ensure the safety of employees, especially in danger-filled industries with heavy […]

Our Clients